The Agency for Research and Development of Energy and Mineral Resources, Ministry of Energy and Mineral Resources, Republic of Indonesia dan The New Energy and Industrial Technology Development Organization, Japan concerning

No Bentuk Mengenai Para Pihak Tahun
1 Nota Kesepahaman The International Cooperative Demonstration Project on Stabilized and Advanced Grid–Connection Photovoltaic Systems

The Agency for Research and Development of Energy and Mineral Resources, Ministry of Energy and Mineral Resources, Republic of Indonesia

dan

The New Energy and Industrial Technology Development Organization, Japan concerning

Berlaku Berakhir
2009
30 September 2009

31 Desember 2009

Kronologis :

Karena sistem peralatan stabilized and grid–connection photovoltaic system masih belum juga dapat berfungsi sempurna akibat terjadinya gangguan listrik jaringan PLN tanggal 29 Desember 2008 pukul 22.39 WIB, maka dibutuhkan tambahan waktu untuk penyempurnaan sebelum dilakukan penyerahan asset. Sehingga dilakukan amandemen kedua.

Hasil :

Pada tahun 2010, sedang dilakukan persiapan untuk serah terima asset (hibah) peralatan dari NEDO, Jepang ke Balitbang ESDM, Indonesia, dimulai dengan inventarisasi perlatan